Bloomington, IN Closed 4 months

Potholes, Other Street Repair

Culvert repair began in November 2025. Since that was finished and a temporary patch made, there has been no further paving. As a result, a 30 yard long stretch of Browncliff, at the bottom of a small hill, is crumbling, full of potholes, and has a big dip where the culvert was reconstructed. Please get to this soon, while there is still a bit of pavement left.