Boston, MA Open About 2 years

Pothole

The entire section of Beacon Street between Berkeley and Clarendon Streets needs to be repaved, there are large potholes and cracks throughout the roadway. This is after the road was under construction for 18 months to install a gas line and run it to the buildings (18 months for 1 block), the road is in completely unacceptable condition and is heavily traffic, 1 of the 3 car travel lanes was also dedicated for bicycle only use, further increasing stress on the 2 remaining car lanes.